Microsoft Dynamics AX 2012 R3 white paper: Work breakdown structures
This white paper describes how to create and use a work breakdown structure of tasks for projects in Microsoft Dynamics AX 2012.
Important! Selecting a language below will dynamically change the complete page content to that language.
Version:
2012
Date Published:
7/10/2014
File Name:
Work Breakdown Structures in Microsoft Dynamics AX 2012 R3.pdf
File Size:
1.0 MB
In Microsoft Dynamics AX 2012, you can use a work breakdown structure (WBS) to organize and prioritize tasks for a project. In a WBS, you create a hierarchy of tasks that represents the project team’s understanding of the composition of work, and the size, cost, and duration of each component or task. This white paper describes how to create and maintain a WBS, and how to create a WBS template that you can use for similar projects.Supported Operating Systems
Windows 7, Windows 8, Windows Server 2008, Windows Server 2012
- To view the PDF file, you will need a PDF reader, such as the free Adobe Reader.
- For information about the system requirements for Microsoft Dynamics AX 2012, see System requirements for Microsoft Dynamics AX 2012.
- Click Download to download the document in PDF file format.
- Save the file to your computer.
Follow Microsoft