Trace Id is missing

Copilot is your AI companion

Always by your side, ready to support you whenever and wherever you need it.
A picture of a dog with a pop up bubble saying Talk to Copilot and asking What celeb does my dog look like?

Microsoft® Forefront Identity Manager (FIM) Capacity Planning Guide

This document describes items to consider when planning the capacity of your FIM 2010 installation.

Important! Selecting a language below will dynamically change the complete page content to that language.

Download
  • Version:

    1

    Date Published:

    8/16/2010

    File Name:

    FIM_Capacity_Planning.doc

    File Size:

    768.0 KB

    This document discusses hardware, software, topologies, and general specifications that will help you ensure your FIM installation performs as planned.
  • Supported Operating Systems

    Windows Server 2008

    Word Viewer or Microsoft Office Word.
  • Download the document and review the information.
  • There are a number of variables that can affect the overall capacity and performance of your FIM 2010 deployment. The ways in which you physically deploy the FIM components (topology), as well as the hardware on which those components run, are important factors in determining the performance and capacity that you can expect from your FIM deployment. The number and complexity of the FIM policy configuration objects may be less obvious, but they are still significant factors to consider when planning for capacity. Finally, the expected scale of the deployment, as well as the load that is expected to be placed on it, are typically more obvious factors that affect performance and capacity

Follow Microsoft